Galvanised steel fittings and copper fittings for railway overhead equipment, manufactured to the ETI/OHE drawing series under RDSO items 3100659 and 3100653 — 65 sub-items. This page names the sub-item IDs and the mark numbers, because a railway buyer searches by code and not by marketing copy.
Indo East Corporation manufactures galvanised steel fittings and copper fittings for railway overhead equipment at its Jangalpur works in Howrah, to the ETI/OHE drawing series under RDSO item 3100659 (galvanised steel fittings) and item 3100653 (copper fittings) — 65 sub-items between them: anti wind straps, U-bolts, packing pieces, double end studs, counter weight rods, plates and eye rods, compensating and equalising plates, guy rods, earth electrodes and copper terminal lugs.
Steel to IS 2062, hot-dip galvanized in our own 7 metre kettle to IS 2629 and IS 4759 at 75–85 microns. Fittings are the items where the coating decides service life, and because the galvanizing is on our own floor the coating record and the fabrication record come from one works. We are RDSO approved for railway structures and make OHE masts, portals, brackets and steel channel sleepers on the same floor — which is why the coating on the fitting matches the coating on the mast it bolts to.
Item code, what it covers, and the drawing series it is issued against.
| RDSO item | What it covers | Drawings |
|---|---|---|
| 3100659 Galvanised steel fittings | Steel OHE fittings — anti wind straps and clamp straps, U-bolts, packing pieces, double end studs, guide plate weights, counter weight rods, plates and eye rods, compensating and equalising plates, guy rods and earth electrodes | ETI/OHE/P series |
| 3100653 Copper fittings | Current-carrying copper fittings for the overhead equipment, including terminal lugs to suit the conductor | ETI/OHE/P series, including sheets 1310 and 1311 |
Between them the two schedules run to 65 sub-items, each with its own sub-item ID and mark number. The Railway purchase system reads an enquiry by sub-item ID rather than by description — so send the IDs, and the quotation comes back against the right part.
A sample of the schedule under item 3100659, by sub-item ID and mark number.
| Sub-item ID | Mark | Description |
|---|---|---|
| 3100659001 | 2113 | Galvanised MS ‘U’ bolt |
| 3100659002 | 2502 | Anti wind strap |
| 3100659003 | 2503 | Anti wind strap |
| 3100659004 | 2504 | Anti wind clamp strap |
| 3100659012 | 2133 | Galvanised MS ‘U’ bolt |
| 3100659018 | 5067 | Packing piece |
| 3100659019 | 5097 & 16N | Double end stud ø16, 1150/100, with two nuts |
| 3100659020 | 5096 | Guide plate weight |
| 3100659021 | 5099-1 | Counter weight rod, M20 |
| 3100659022 | 5097-3 & 16N | Double end stud M16, 1890/100, with two nuts |
| 3100659024 | 5098 | Counter weight plate, 5 kg |
| 3100659025 | 5099 | Counter weight eye rod, 1.55 m |
| 3100659026 | SK-588 | Counter weight eye rod, 1.80 m |
| 3100659028 | 5191-1 | Compensating plate |
| 3100659029 | 5191-2 | Compensating plate |
| 3100659031 | 5192-1 | Equalising plate |
| 3100659032 | 5192-2 | Equalising plate |
| 3100659033 | 5193 | Short equalising plate |
| 3100659034 | 5194 | Compensating plate |
| 3100659036 | 5194-1 | Compensating plate |
| 3100659037 | 5195 | Equalising plate |
| 3100659038 | 5195-2 | Equalising plate, 8 mm |
| 3100659047 | 5005-1 | Guy rod, ø25 mm |
| 3100659049 | — | Earth electrode, 4 m |
This is part of the schedule, not all of it. Send your bill of materials and we will mark it line by line against the sub-item IDs.
Copper fittings are a separate item with their own schedule of technical requirements, their own machining expectations and their own testing. The schedule covers the current-carrying connection parts on the overhead equipment, including terminal lugs to suit the conductor (reference no. 6) and the parts carried on the ETI/OHE/P/1310 and 1311 sheets. Copper chemistry is checked on the spectrometer in our own laboratory before machining, and the finished part is inspected dimensionally against the drawing.
Where a sheet carries more than one part — the detail that causes most of the confusion on these items.
| Drawing sheet | Parts carried |
|---|---|
| ETI/OHE/P/2341 | Marks 2341, 2342, 2343 and 2344, tabulated on one sheet |
| ETI/OHE/P/5004/5/6-1 | Marks 5004, 5005 and 5006-1 |
| ETI/OHE/P/6075/6076 | Both clamps, 6075 and 6076 |
| ETI/OHE/P/5001/5001-1 | Both variants, 5001 and 5001-1 |
| ETI/OHE/P/1310 | Carries part 1311 — copper fittings |
| ETI/OHE/P/5191 and 5192 | Base part only. The -1 and -2 variants are separate sheets |
CORE STR-20 for galvanised steel fittings, STR-17 for copper fittings — and what we hold against them.
| What the STR expects | What is on the floor at Jangalpur |
|---|---|
| Chemical analysis of the material | Optical emission spectrometer in a dedicated, controlled spectrometer room |
| Tensile and proof load testing | Universal testing machine, horizontal and vertical |
| Hardness testing | Rockwell hardness tester |
| Coating thickness and coating mass | Calibrated dry film thickness gauges; precision balance for coating mass |
| Surface flaw detection | Dye penetrant testing |
| Galvanizing facility | Own hot-dip galvanizing plant, 7.0 × 1.2 × 1.6 m kettle — no sub-contractor |
| Forming and straightening | Press brake, hydraulic and power presses, CNC plasma cutting |
| Traceability | Heat number through inward register and batch card to the mark on the despatched part |
| Quality system | ISO 9001:2015, 14001:2015 and 45001:2018; integrated management system manual; QAP per item |
| NABL type-test reports | Arranged with an accredited laboratory. Our own laboratory is not NABL-accredited |
Structural steel IS 2062 · Galvanizing IS 2629, IS 4759, IS 6745, IS 2633 · Fasteners IS 1367 · Earthing IS 3043 · Welding IS 816, AWS D1.1; inspection IS 822 · Tolerances IS 7215 · Drawings ETI/OHE/P series · Requirements CORE STR-20 and STR-17.
ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 certified. RDSO approved for railway structures. IEC 0211004090. EEPC India member M39992, RCMC/EEPCINDIA/07882/2026-2027, valid to 31 March 2027.
Answered from our own works and our own paperwork, not from a brochure.
Two: item 3100659 — galvanised steel fittings, and item 3100653 — copper fittings. Between them the schedules cover 65 sub-items, each with its own sub-item ID, mark number and ETI/OHE drawing. RDSO and the Railway purchase system read an enquiry by sub-item ID, not by description, so if you are sending a bill of materials, send the IDs and the answer comes back against the right part.
The steel fittings that hold the overhead equipment in place and keep the contact wire at tension: anti wind straps and clamp straps (marks 2502, 2503, 2504), galvanised MS U-bolts (2113, 2133), packing pieces (5067), double end studs with nuts (5097, 5097-3), guide plate weights (5096), counter weight rods, plates and eye rods (5098, 5099, 5099-1, SK-588), compensating and equalising plates (5191-1, 5191-2, 5192-1, 5192-2, 5193, 5194, 5194-1, 5195, 5195-2), guy rods (5005-1) and earth electrodes. The table on this page names them against their sub-item IDs.
The current-carrying fittings on the overhead equipment, including terminal lugs to suit the conductor (reference no. 6) and the associated connection parts carried on the ETI/OHE/P/1310 and 1311 drawing sheets. Copper fittings are a separate item with their own schedule of technical requirements and their own machining and testing expectations. Copper chemistry is checked on the spectrometer in our own laboratory before machining.
The ETI/OHE/P series — the Railway Electrification traction drawing sheets. A single sheet often carries several parts: ETI/OHE/P/2341 carries 2341 through 2344; ETI/OHE/P/5004/5/6-1 carries 5004, 5005 and 5006-1; ETI/OHE/P/6075/6076 carries both clamps; ETI/OHE/P/5001/5001-1 carries both variants; ETI/OHE/P/1310 carries part 1311. Others carry only the base part — ETI/OHE/P/5191 and 5192 do not carry their -1 and -2 variants, which are separate sheets. We work to the drawing, and where a drawing and a bill of materials disagree, the drawing wins.
The CORE schedules of technical requirements: STR-20 for galvanised steel fittings and STR-17 for copper fittings. They set out the plant, the testing facilities and the quality system a manufacturer has to hold — chemical analysis, tensile testing, hardness, coating thickness, dye penetrant, calibration, traceability from heat number to finished part, a quality assurance plan, and a rejection and field-failure system. The table on this page sets each requirement against what is actually on our floor.
Optical emission spectrometry for steel and copper chemistry in a dedicated spectrometer room, a universal testing machine for tensile and proof load, hardness testing, calibrated coating thickness gauges, dye penetrant, precision weighing for coating mass, and dimensional inspection against the drawing. Our laboratory is not NABL-accredited; where a specification requires NABL type-test reports, that testing is arranged with an accredited laboratory against the order. We say so rather than letting it surface at inspection.
Hot-dip galvanized in our own kettle at Jangalpur to IS 2629 and IS 4759, at 75–85 microns — about 610 g/m² of zinc — read on a calibrated dry film thickness gauge, batch by batch. Fittings and small hardware are the items where coating decides service life, and because the galvanizing is on our own floor rather than sub-contracted, the coating record and the fabrication record come from the same works.
Yes, and from the same floor. We are RDSO approved for railway structures and manufacture OHE masts, portals and brackets and steel channel sleepers — the sleepers since 2001. Structures and fittings go into the same kettle, which is why the coating on the fitting matches the coating on the mast it bolts to. See railway OHE structures and steel channel sleepers.
The sub-item IDs or the mark numbers, the quantities, the coating figure the specification states, the inspection agency, and whether the scope is ex-works or delivered. We mark the bill of materials line by line and a formal quotation typically goes back within 48 business hours.
Because a railway buyer searches by item code and mark number, not by marketing copy. An enquiry for mark 5192-1 is not an enquiry for “OHE fittings”, and a page that does not name the part cannot answer it. Every code, mark and drawing reference on this page can be checked against the Railway’s own schedules.
Give us the RDSO sub-item IDs or the mark numbers and we will mark your bill of materials line by line, with the coating figure your specification states and the inspection agency it names. Galvanizing is on our own floor, so the coating record comes from the same works as the part.
Request a quotation Kavach towers Railway OHE structures